Project

ESIA for the proposed Sandpiper Marine Phosphate Project within ML 170, offshore, Namibia

Namibian Marine Phosphate (Pty) Ltd.

Environmental Compliance Consultancy (ECC) has been contracted by Namibian Marine Phosphate (Pty) Ltd (NMP) to revise and update the environmental and social impact assessment (ESIA) for dredging of marine phosphate material within ML 170, offshore, Namibia.

The proposed project is located within mining licence ML 170 and is referred to as the Sandpiper Marine Phosphate Project (referred to as “the Project” herein).  Namibian Marine Phosphate (Pty) Ltd (hereafter referred to as “The Proponent”), is the official applicant for the proposed project and environmental clearance application.

Previous exploration activities have verified to internationally approved standards the existence of a world-class economically viable marine phosphate deposit in the mining licence area ML 170.  The mining licence comprises an area of 2,233 km2 and is located offshore approximately 120km southwest of Walvis Bay. The eastern boundary of the mining licence is located approximately 40 km off the coast (directly west of Conception Bay) and water depths where the deposit is situated range from 190 m at the eastern boundary to 300 m and the western boundary of the mining licence.  The proposed project is located within the priority mining area for industrial minerals: phosphate in terms of the draft marine spatial plan.

The intention is to develop these deposits using proven deep water dredging techniques, transfer the product to shore at Walvis Bay where minimal beneficiation is required to separate the phosphate from other marine sediments. The processed product is an exportable phosphate concentrate.

 

Project Details

Proponent's Name

Namibian Marine Phosphate (Pty) Ltd.

ECC's Role

Environmental Compliance Consultancy cc. hereby gives notice to all members of the public that an application for an environmental clearance certificate in accordance with the Environmental Management Act, No. 7 of 2007 will be made for the proposed Sandpiper Marine Phosphate Project within ML 170, offshore, Namibia. Members of the public are invited to register as an Interested and Affected Party (IAP) and provide input into the environmental and social impact assessment.

Sectors

Mining & Minerals

Countries

Namibia

Status

Approval Obtained

Download Files

Report
Appendix O Specialists CVs
4.6 MB
Report
Appendix D EAP CVs
0.6 MB
Report
Appendix C IAP Comments Consolidation
5.1 MB
Report
Appendix B Summary of public consultation document
8.4 MB
Report
Appendix A Environmental management plan
1.3 MB
Report
ECC 133 377 REP 03 D ESIA Report Final
5.1 MB
Report
Appendix N 2014 Verification study
40.1 MB
Report
Appendix M ECs Scoping report ackowledgement letter
0.1 MB
Report
Appendix L Supplementary phosphate industry socio economic specialist study
0.8 MB
Report
Appendix K Noise modelling specialist study
0.1 MB
Report
Appendix J Toxicity specialist study
1.0 MB
Report
Appendix I hydrodynamic modelling turbidity thr
0.5 MB
Report
Appendix I HR Wallingford plume dispersion mode
32.6 MB
Report
Appendix H Socio economic specialist study
0.1 MB
Report
Appendix G Independent Review by Andy Payne
0.2 MB
Report
Appendix F Fisheries mammals and seabirds specialist study
3.2 MB
Report
Appendix E Water column sediments and benthos specialist study
1.5 MB
Report
ECC 133 377 REP 03 A Scoping Report FINAL
2.8 MB
Report
ECC 133 377 BID 02 B BID REV2
1.0 MB
Report
NMP Public Meeting Presentation Feb 2022 v2 final
2.9 MB

Register an Interest

Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.

Your details
First Name *
Last Name *
Company / Organisation
Nature of company or organisation
Email Address *
Telephone No. *
Address
Street Address *
Address Line 2
City *
ZIP / Postal Code *
Country *
Your interest
Declaration of Interest *
Please describe your interest in this project.
Comments *
Consent
Your information is used only for the public participation process for this project. It is not sold or shared for marketing. We keep it for the duration of the project and for five years after the record of decision, after which it is deleted. To correct or delete your details, email info@eccenvironmental.com. See our Privacy Policy for more.