Namchar is operating at an existing facility. The following activities and infrastructure are associated with the project:
- Continued operation of existing charcoal and briquette storage, processing, and packaging facility, offices, as well as toilet facilities.
- Water is sourced via the NamWater pipeline system.
- Electricity is supplied by a three (3) phase NamPower electricity network.
- New infrastructure to be built includes: a weighbridge to be built in the future.