Project

ESIA amendment for the Twin Hills Gold Project, Karibib District, Erongo Region

Twin Hills Gold Mine on ML 238 ESIA amendment

Environmental Compliance Consultancy (ECC) has been contracted by Osino Gold Exploration and Mining (Pty) Ltd. OGEM manages operations in Namibia as a wholly owned Shanjin International Gold Co. ECC is conducting an ESIA for the proposed mining of precious metals on Mining Licence 238 (ML 238), located near the town of Karibib, Erongo Region, Namibia.

The original assessment was submitted to the Ministry of Industries, Mines and Energy (MIME) as the competent authority and the Ministry of Environment, Forestry and Tourism (MEFT) in March 2022, and RoD approval was granted on the 3rd of November 2022.

Since then, the Proponent has reviewed their operational requirements and an amendment to the original ESIA is required, as updates and changes to the site layout and proposed infrastructure have been finalised. Therefore, these noted changes and potential related impacts have been re-assessed and will be submitted to MEFT and the component authority (MIME) for approval.

ECC’s Role

Environmental Compliance Consultancy (Pty) Ltd. (ECC) hereby gives notice to all members of the public that an amendment application for an environmental clearance certificate in accordance with the Environmental Management Act, No. 7 of 2007 will be made for the proposed Twin Hills Gold Project in the Erongo Region. Members of the public are invited to register as an Interested and Affected Party (IAP) and provide input into the environmental and social impact assessment.

Download Documents

20 files
pdf
Appendix A – Osino Operational Environmental Management Plan Final
95.16 MB
pdf
Osino ESIA Amendment Final
118.99 MB
pdf
Appendix A – Construction Environmental Management Plan.pdf
5.12 MB
pdf
Appendix M – Osino ML 238 ECC 2022.pdf
4.73 MB
pdf
Appendix L – EAP CVs.pdf
1.65 MB
pdf
Appendix K – Blast Management Assessment Report.pdf
35.22 MB
pdf
Appendix J – Climate Change Assessment Report.pdf
8.36 MB
pdf
Appendix I – SocioEconomic Impact Assessment.pdf
4.7 MB
pdf
Appendix H – Traffic Impact Assessment.pdf
3.11 MB
pdf
Appendix G – Archaeological Assessment Report (5 Graves Sites Report).pdf
2.46 MB
pdf
Appendix G – Archaeological Assessment Report (Possible Grave Sites Report).pdf
8.23 MB
pdf
Appendix G – Archaeological Assessment Report (Exhumation, Relocation and Reburial Report) .docx.pdf
48.52 MB
pdf
Appendix G – Archaeological Assessments Reports (NHC Consent for Osino ML 238).pdf
212.75 KB
pdf
Appendix F – Biodiversity Assessment Report.pdf
2.85 MB
pdf
Appendix E – Water Assessment Report (Feed Geichemical Testing).pdf
1.01 MB
pdf
Appendix E – Water Assessment Report (Surface Water).pdf
5.56 MB
pdf
Appendix E – Water Assessment Report (FEED Hydrology summary).pdf
4.82 MB
pdf
Appendix D – Air Quality Assessment Report.pdf
6.04 MB
pdf
Appendix C – Noise Assessment Report.pdf
9.61 MB
pdf
Appendix B – Public Consultation Records.pdf
8.26 MB

Project Details

Proponent

Osino Gold Exploration and Mining (Pty) Ltd

Status

Approval Obtained

Sector

Mining & Minerals

Country

Namibia

Register an Interest

Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.

  • This field is for validation purposes and should be left unchanged.