Project

Proposed construction and operation of the PV2FUEL Arandis – a green ammonia plant, Arandis, Erongo Region, Namibia

Green Ammonia Production Plant

The Project is located on a 2400 hectares (ha) portion of land outside of the Arandis town. The Project involves the production of green ammonia using renewable energy. Electricity generated from a 1.2 gigawatts (GW) solar park is used to produce hydrogen via water electrolysis. The hydrogen is then combined with nitrogen extracted from air to produce ammonia. A battery energy storage system (BESS) of 1.5 gigawatt hours GWh supports continuous and flexible operation by supplying electricity during periods of low solar generation (at night).

ECC’s Role

ECC has been engaged by CMB.TECH Namibia (Pty) Ltd as the independent Environmental Assessment Practitioner (EAP) to facilitate the entire ESIA process. Before the start of the proposed Project, an environmental clearance certificate is required in terms of the Environmental Management Act, 7 of 2007 and the associated EIA Regulations. A final decision regarding the above-mentioned application will be made by the Ministry of Environment, Forestry and Tourism (MEFT), Department of Environmental Affairs and Forestry (DEAF).

Download Documents

FileAction
ECC-145-725-BID-02-D_Final.pdfDownload

Project Details

Proponent

CMB.TECH Namibia (Pty) Ltd

Status

Open for Public Participation

Sector

Energy

Country

Namibia

Register an Interest

Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.