Paratus Telecommunications (Pty) Ltd proposes to construct a communication tower on ERF 361 in Brakwater to the north of Windhoek. The tower will consist of a base transceiver station and associated infrastructure. The preferred tower height will be 48 meters in order to provide adequate transmission and reception of telecommunication service signals.
ECC’s Role
Environmental Compliance Consultancy (ECC) has been engaged by Paratus Telecommunication (Pty) Ltd (the proponent) to undertake an Environmental Impact Assessment (EIA) and an Environmental Management Plan (EMP) in terms of the Environmental Management Act No 7 of 2007 and its Regulations. ECC has determined that the Ministry of Information and Communication Technology (MICT) and the Ministry of Environment, Forestry, and Tourism (MEFT) are the competent authorities for this project.
Download Documents
File | Action |
---|
ECC-45-365-REP-06-D – EMP.pdf | Download |
EEC-45-365-REP-07-D SR final.pdf | Download |
ECC-45-365-BID-03-D.pdf | Download |