The proponent, ISPS Solar Operations Namibia (Pty) Ltd (previously Mettle Solar Namibia Operations) intends to construct and operate a 13 MW solar photovoltaic (PV) power plant on farm Maxwell No. 82, which will be linked to the Eldorado substation and supply B2Gold (Otjikoto mine) with electricity through the Namibian Modified Single Buyer (MSB) framework.
ECC’s Role
Environmental Compliance Consultancy (ECC) has been engaged by the proponent to undertake an ESIA and develop an Environmental Management Plan (EMP) in terms of the Environmental Management Act, 2007 and its regulations. An environmental clearance application will be submitted to the Ministry of Environment, Forestry and Tourism (MEFT) for the project, which is the relevant authority to issue a Record of Decision (RoD) with regards to the proposed project.
Download Documents
File | Action |
---|
ECC-130-375-REP-06-D Combined.pdf | Download |
ECC-130-375-REP-07-C EMP.pdf | Download |
ECC-130-375-BID-04-D.pdf | Download |