The Proponent, Mandarin Investments (Pty) Ltd, on behalf of Namibia Power Corporation (NamPower) (Pty) Ltd, proposes to construct a 90 km long 132 kV overhead power supply and associated infrastructure from the NamPower Omburu substation to the proposed Kokoseb Gold Mine Project on ML 274. Associated infrastructure will include a 132 kV metering station, which will be developed approximately 10 km away from the mine, and power will be transmitted to a 132/11 kV substation, located close to the mine processing plant via a 10 km monopole line. The overhead powerline will supply the energy required for various mine operational activities throughout the LoM.
Mandarin Investments (Pty) Ltd has engaged ECC as the independent Environmental Assessment Practitioner (EAP) to facilitate the entire ESIA process. Before the start of the proposed projects, an environmental clearance certificate is required in terms of the Environmental Management Act, 7 of 2007 and the associated EIA Regulations. A final decision regarding the above-mentioned application will be made by the Ministry of Environment, Forestry and Tourism (MEFT), Department of Environmental Affairs and Forestry (DEAF).
| File | Action |
|---|---|
| ECC-143-719-BID-01-A_Final.pdf | Download |
Mandarin Investments (Pty) Ltd
Open for Public Participation
Energy, Infrastructure & Construction
Namibia
Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.