The Proponent proposes to construct and operate a 30 m BTS tower (a lattice self-supporting steel structure), along with associated infrastructure on Erf 397, Outjo East. Land use approval for this Project has been issued by the Outjo Municipality. The BTS tower will improve and provide adequate transmission and reception of telecommunication service signal to the residents and business operators.
ECC has been appointed by Paratus Telecommunications (Pty) Ltd. as the independent Environmental Assessment Practitioner (EAP) to facilitate the entire ESIA process. Prior to the start of the proposed projects, an environmental clearance certificate is required in terms of the Environmental Management Act, 7 of 2007 and the associated EIA Regulations. A final decision relating to the above-mentioned application will be made by Ministry of Environment, Forestry and Tourism (MEFT): Department of Environmental Affairs (DEA).
File | Action |
---|---|
ECC-45-569-BID-02-A_Final.pdf | Download |
Paratus Telecommunications (Pty) Ltd
Open for Public Participation
Infrastructure & Construction
Namibia
Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.
© ECC ENVIRONMENTAL. ALL RIGHTS RESERVED. SITE POWERED BY THINKTEAM