The proposed Project is the construction of a 12.7 km ammonia pipeline from Farm 58 (near Dune 7) to Walvis Bay port area. The purpose of the pipeline is to connect the green ammonia production plant to the ammonia terminal in Walvis Bay. A carbon steel pipeline will transport daily 800 metric tons of green ammonia from the ammonia production plant on Farm 58 to the storage unit at the port of Walvis Bay.
ECC has been contracted by CMB.TECH Namibia (Pty) Ltd as the independent Environmental Assessment Practitioner (EAP) to facilitate the entire ESIA process. Prior to the start of the proposed projects, an environmental clearance certificate is required in terms of the Environmental Management Act, 7 of 2007 and the associated EIA Regulations. A final decision relating to the above-mentioned application will be made by Ministry of Environment, Forestry and Tourism (MEFT): Department of Environmental Affairs (DEA).
File | Action |
---|---|
Addendum Report.pdf | Download |
Final Public Consultation Document.pdf | Download |
Preliminary ESMP.pdf | Download |
Final ammonia pipeline scoping report.pdf | Download |
Draft scoping report.pdf | Download |
Draft Environmental and Social Management Plan.pdf | Download |
Background Information Document.pdf | Download |
Cleanergy Presentation 8-10 July '24.pptx | Download |
Cleanergy – Public Meeting March ECC.pdf | Download |
Cleanergy Solutions Presentation_12-03-24.pdf | Download |
CMB.TECH Namibia (Pty) Ltd
Open for Public Participation
Energy, Infrastructure & Construction
Namibia
Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.
© ECC ENVIRONMENTAL. ALL RIGHTS RESERVED. SITE POWERED BY THINKTEAM