Project

The proposed construction of an ammonia pipeline from Farm 58 to Walvis Bay Port, Erongo Region, Namibia

The proposed Project is the construction of a 12.7 km ammonia pipeline from Farm 58 (near Dune 7) to Walvis Bay port area. The purpose of the pipeline is to connect the green ammonia production plant to the ammonia terminal in Walvis Bay. A carbon steel pipeline will transport daily 800 metric tons of green ammonia from the ammonia production plant on Farm 58 to the storage unit at the port of Walvis Bay.

ECC’s Role

ECC has been contracted by Cleanergy Solutions Namibia (Pty) Ltd as the independent Environmental Assessment Practitioner (EAP) to facilitate the entire ESIA process. Prior to the start of the proposed projects, an environmental clearance certificate is required in terms of the Environmental Management Act, 7 of 2007 and the associated EIA Regulations. A final decision relating to the above-mentioned application will be made by Ministry of Environment, Forestry and Tourism (MEFT): Department of Environmental Affairs (DEA).

Download Documents

FileAction
Cleanergy – Public Meeting March ECC.pdfDownload
Cleanergy Solutions Presentation_12-03-24.pdfDownload
ECC-145-480 (a)-BID-02-D.pdfDownload

Project Details

Proponent

Status

Open for Public Participation

Sector

Energy, Infrastructure & Construction

Country

Namibia

Register an Interest

Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.

  • This field is for validation purposes and should be left unchanged.