Project

The proposed construction of five concrete transformer platforms and the upgrade of an existing wash and service bay at Brakwater, Khomas Region, Namibia

The proposed project is the construction of five concrete transformer platforms with a large catchment pit for the collection of spilled liquid, i.e oil. There will be an upgrade of an existing wash bay and service bay which includes an oil catchpit and oil separator for their service vehicles and trucks.

ECC’s Role

ECC has been contracted by Burmeister & Partners (Pty) Ltd on behalf of Namibia Power Corporation (NamPower) (Pty) Ltd as the independent Environmental Assessment Practitioner (EAP) to facilitate the entire ESIA process. Prior to the start of the proposed projects, an environmental clearance certificate is required in terms of the Environmental Management Act, 7 of 2007 and the associated EIA Regulations. A final decision relating to the above-mentioned application will be made by Ministry of Environment, Forestry and Tourism (MEFT): Department of Environmental Affairs (DEA).

Download Documents

FileAction
NamPower ECC.pdfDownload
ECC-140-469-REP-07-D.pdfDownload
ECC-140-469-REP-04-D.pdfDownload
ECC-140-469-BID-03-D.pdfDownload

Project Details

Proponent

Status

Approval Obtained

Sector

Energy, Infrastructure & Construction

Country

Namibia

Register an Interest

Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.

  • This field is for validation purposes and should be left unchanged.