Project

ESIA for the proposed Twin Hills Gold Project, Karibib District, Erongo Region.

Osino Gold Exploration and Mining (Pty) Ltd

Environmental Compliance Consultancy (ECC) has been contracted by Osino Gold Exploration and Mining (Pty) Ltd. (OGEM), a Namibian company and subsidiary of Osino Resources Corp., to undertake an environmental and social impact assessment (ESIA). OGEM manages operations in Namibia as a wholly owned subsidiary of Osino Namibia Holdings (Pty) Ltd. which is in turn a subsidiary of Osino Resources Corp. ECC is conducting an ESIA for the proposed mining of precious metals on Mining Licence 238 (ML 238), located near the town of Karibib, Erongo Region, Namibia.

The Proponent has focused on the acquisition and development of potential gold projects in Namibia through extensive exploration programmes. The advanced and successful exploration programme near Karibib has resulted in the development of the Twin Hills Gold Project, or Project. The proposed Project will be a conventional open pit mine with a gold extraction process similar to existing gold mines in Namibia, for example the Otjikoto and Navachab mines.

 

ECC’s Role

Environmental Compliance Consultancy cc. hereby gives notice to all members of the public that an application for an environmental clearance certificate in accordance with the Environmental Management Act, No. 7 of 2007 will be made for the proposed Twin Hills Gold Project in the Erongo Region. Members of the public are invited to register as an Interested and Affected Party (IAP) and provide input into the environmental and social impact assessment.

Download Documents

FileAction
20ECC02_Osino_AQIA_Rev1.pdfDownload
Appendix B Public Consultation.pdfDownload
ECC-103-332-REP-01-A_Final ESIA Report for Gov Submisison 9.3.2022.pdfDownload
ECC-103-332-REP-18-A Final ESMP 9.3.2022.pdfDownload
BID ECC-103-332-BID-DDownload
ECC-103-332-LET-17-A Osino project Notice-2Download
Public Participation Meetings Namibia Final.pptxDownload
Appendix_C_NoiseBaseline_Ver_0.1Download
Appendix_D_AirQualityBaseline-Rev1Download
Appendix_E_KnightPiesoldP_WaterBaselineDownload
Appendix_E_SLR_InitialScreeningDownload
Appendix_F_BiodiversityBaselineDownload
Appendix_G_ArchaeologicalBaselineStudyDownload
Appendix_H – Traffic ImpactDownload
Appendix_I_SocioEconomicBaselineStudyDownload

Project Details

Proponent

Osino Gold Exploration and Mining (Pty) Ltd

Status

Approval Obtained

Sector

Mining & Minerals

Country

Namibia

Register an Interest

Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.

  • This field is for validation purposes and should be left unchanged.