Project

Proposed construction of a base transceiver station and associated infrastructure for Paratus Telecommunications (Pty) Ltd on Erf 361 in Brakwater, Khomas Region.

Construction of a base transceiver station and associated infrastructure

Paratus Telecommunications (Pty) Ltd proposes to construct a communication tower on ERF 361 in Brakwater to the north of Windhoek. The tower will consist of a base transceiver station and associated infrastructure. The preferred tower height will be 48 meters in order to provide adequate transmission and reception of telecommunication service signals.

Project Details

Proponent's Name

Paratus Telecommunications (Pty) Ltd

ECC's Role

Environmental Compliance Consultancy (ECC) has been engaged by Paratus Telecommunication (Pty) Ltd (the proponent) to undertake an Environmental Impact Assessment (EIA) and an Environmental Management Plan (EMP) in terms of the Environmental Management Act No 7 of 2007 and its Regulations. ECC has determined that the Ministry of Information and Communication Technology (MICT) and the Ministry of Environment, Forestry, and Tourism (MEFT) are the competent authorities for this project.

Sectors

Infrastructure & Construction

Countries

Namibia

Status

Approval Obtained

Download Files

Report
Osino ECC
1.2 MB
Report
ECC 45 365 Paratus Data Centre Tower ESIA Brakwater
0.7 MB
Report
ECC 45 365 REP 06 D EMP
0.6 MB
Report
EEC 45 365 REP 07 D SR final
4.3 MB
Report
ECC 45 365 BID 03 D
1.1 MB

Register an Interest

Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.

Your details
First Name *
Last Name *
Company / Organisation
Nature of company or organisation
Email Address *
Telephone No. *
Address
Street Address *
Address Line 2
City *
ZIP / Postal Code *
Country *
Your interest
Declaration of Interest *
Please describe your interest in this project.
Comments *
Consent
Your information is used only for the public participation process for this project. It is not sold or shared for marketing. We keep it for the duration of the project and for five years after the record of decision, after which it is deleted. To correct or delete your details, email info@eccenvironmental.com. See our Privacy Policy for more.