Project

The proposed Omitiomire Copper Mine on ML 197 in the Khomas Region, Namibia

Omitiomire Copper Mine

Craton Mining and Exploration (Pty) Ltd holds mining licence 197 (ML 197) over farm Omitiomire, located 140km northeast of Windhoek (by road) and approximately 39km south of Hochfeld, in the Khomas Region of Namibia.

The exploration which Craton has undertaken since 2007 has identified that the Omitiomire resource holds 137 million tonnes at 0.55% Copper (Cu). Most of the deposit is in the form of copper sulphides, containing high proportions of copper and low proportions of sulphur. The copper sulphides have been oxidised near the surface, and at depth next to major fractures and fault lines. The oxidised copper ores make up approximately 15% of the total deposit. Mining activities will focus on the near surface oxide resource which is estimated to be 427,000 tonnes at 0.93% Cu.

The proposed mine includes one opencast pit, an ore processing plant, heap leach pads, waste rock dumps, a tailings deposition facility, workshops, water management infrastructure, related support services and facilities, and an onsite accommodation facility. The mining operation is expected to produce an estimated amount of 6.8 Mt of ore with an approximate pit depth of 250m. There is also a proposed diversion of main road (M53), and the Black Nossob River to accommodate the pit dimensions.

Project Details

Proponent's Name

Craton Mining and Exploration (Pty) Ltd

ECC's Role

ECC has been contracted by Craton Mining and Exploration (Pty) Ltd, as the independent Environmental Assessment Practitioner (EPA), to facilitate the whole ESIA process. Prior to the start of the proposed Project, an environmental clearance certificate has to be issued in terms of the Environmental Management Act, 7 of 2007 and the associated EIA Regulations. A final decision relating to the above-mentioned application will be made by Ministry of Environment, Forestry and Tourism (MEFT): Department of Environmental Affairs (DEA).

Sectors

Mining & Minerals

Countries

Namibia

Status

Approval Obtained

Download Files

Report
ECC 134 394 REP 33 D Craton ESMP
0.8 MB
Report
Appendix C2 Addendum report
0.6 MB
Report
Appendix C1 Public consultation document
2.1 MB
Report
Appendix P Omitiomire Hydrogeology Report Final
4.2 MB
Report
Appendix O Climate change report
2.8 MB
Report
Appendix N Blast and vibration specialist report
2.8 MB
Report
Appendix M Noise specialist report
3.6 MB
Report
Appendix L 2 Heritage Impact Assesment Report 2023
0.8 MB
Report
Appendix L 1 Heritage impact assessment report
0.3 MB
Report
Appendix K Traffic specialist report
1.3 MB
Report
Appendix J Biodiversity specialist report
4.6 MB
Report
Appendix I Water supply specialist report
3.3 MB
Report
Appendix H Geochemistry specialist report
5.8 MB
Report
Appendix G Geotechnical report earthwork and foundation
15.7 MB
Report
Appendix F Air Quality Specialist report
2.9 MB
Report
Appendix E Geotechnical report open pit design
3.7 MB
Report
ECC 134 394 REP 32 A Craton Final ESIA
6.5 MB
Report
Craton final scoping report
4.0 MB
Report
ECC 134 394 BID 01 A Final
0.7 MB

Register an Interest

Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.

Your details
First Name *
Last Name *
Company / Organisation
Nature of company or organisation
Email Address *
Telephone No. *
Address
Street Address *
Address Line 2
City *
ZIP / Postal Code *
Country *
Your interest
Declaration of Interest *
Please describe your interest in this project.
Comments *
Consent
Your information is used only for the public participation process for this project. It is not sold or shared for marketing. We keep it for the duration of the project and for five years after the record of decision, after which it is deleted. To correct or delete your details, email info@eccenvironmental.com. See our Privacy Policy for more.