The proposed project is to develop a pilot sustainable water project by means of desalination, powered by solar to supplement the water supply for Walvis Bay.
Environmental Compliance Consultancy (ECC) has been engaged by the proponent a Joint Venture (JV) between Turnkey Water Solutions (Pty) Ltd and Innovent SAS to undertake an ESIA and an Environmental Management Plan (EMP) in terms of the Environmental Management Act, 2007 and its regulations.
Joint Venture (JV) between Turnkey Water Solutions (Pty) Ltd and Innovent SAS
Approval Obtained
Energy, Infrastructure & Construction
Namibia