Project

Proposed construction of a pilot sustainable water supply project by means of desalination, powered by solar to supplement water supply for Walvis Bay, Erongo Region.

Development of a pilot sustainable water project by means of desalination

The proposed project is to develop a pilot sustainable water project by means of desalination, powered by solar to supplement the water supply for Walvis Bay.

ECC’s Role

Environmental Compliance Consultancy (ECC) has been engaged by the proponent a Joint Venture (JV) between Turnkey Water Solutions (Pty) Ltd and Innovent SAS to undertake an ESIA and an Environmental Management Plan (EMP) in terms of the Environmental Management Act, 2007 and its regulations.

Download Documents

FileAction
ECC-106-285-NTS-03-A.pdfDownload
Walvis-Bay-Scoping-Report.pdfDownload

Project Details

Proponent

Joint Venture (JV) between Turnkey Water Solutions (Pty) Ltd and Innovent SAS

Status

Approval Obtained

Sector

Energy, Infrastructure & Construction

Country

Namibia

Register an Interest

Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.

  • This field is for validation purposes and should be left unchanged.