Project

Proposed transportation of industrial sulphuric acid from the Namzinc refinery, to the Skorpion Zinc warehouse at the Port of Luderitz, in the !Karas Region.

Transportation of industrial sulphuric acid from the Namzinc refinery, within Namibia to local consumers, and to the Skorpion Zinc warehouse

The proponent, Skorpion Zinc (Namzinc) (Pty) Ltd, propose to transport 314 000 tonnes of Zinc Sulphide concentrate from their sister company Black Mountain Mining (Pty) Ltd, in South Africa for processing at their Namzinc refinery located in Rosh Pinah, Namibia.

The processing of this material will produce 75 000 tonnes of industrial sulphuric acid, that would then be transported within Namibia to local consumers, and to the Skorpion Zinc warehouse at the Port of Lüderitz for export.  Within the existing warehouse at the port, a storage facility will be constructed to store 15 000 tonnes of sulphuric acid.

Project Details

Proponent's Name

Skorpion Zinc (Namzinc) (Pty) Ltd

ECC's Role

Environmental Compliance Consultancy (ECC) has been engaged by the proponent Skorpion Zinc (Namzinc) (Pty) (Ltd) to undertake an ESIA and an Environmental Management Plan (EMP) in terms of the Environmental Management Act, 2007 and its regulations.
 
An environmental clearance application will be submitted to the relevant competent authorities; the Ministry of Works and Transport (MWT) and Ministry of Environment, Forestry and Tourism (MEFT)

Sectors

Mining & Minerals

Countries

Namibia

Status

Approval Obtained

Download Files

Report
ECC 99 313 REP 15 D Contigency plan
1.9 MB
Report
ECC 99 313 REP 21 D
3.6 MB
Background Document
ECC 99 313 NTS 06 C
1.5 MB

Register an Interest

Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.

Your details
First Name *
Last Name *
Company / Organisation
Nature of company or organisation
Email Address *
Telephone No. *
Address
Street Address *
Address Line 2
City *
ZIP / Postal Code *
Country *
Your interest
Declaration of Interest *
Please describe your interest in this project.
Comments *
Consent
Your information is used only for the public participation process for this project. It is not sold or shared for marketing. We keep it for the duration of the project and for five years after the record of decision, after which it is deleted. To correct or delete your details, email info@eccenvironmental.com. See our Privacy Policy for more.