The proponent Osino Gold Exploration and Mining (Pty) Ltd, proposes the construction of a 66KV overhead powerline connecting the Erongo substation with the Twin Hills Gold Project near Karibib, Erongo Region, Namibia.
ECC has been contracted by Osino Gold Exploration and Mining (Pty) Ltd as the independent Environmental Assessment Practitioner (EAP) to facilitate the entire ESIA process. Prior to the start of the proposed projects, an environmental clearance certificate is required in terms of the Environmental Management Act, 7 of 2007 and the associated EIA Regulations. A final decision relating to the above-mentioned application will be made by Ministry of Environment, Forestry and Tourism (MEFT): Department of Environmental Affairs (DEA)
File | Action |
---|---|
ECC for 66Kv -Twin Hills Gold.pdf | Download |
Appendix B – ECC-103-443-REP-07-D.pdf | Download |
Appendix A – EMP ECC-103-443-REP-08-D.pdf | Download |
Appendix C – EIA for Osino Twin Hills Gold Mine 66 kV power line – Avifauna.pdf | Download |
ECC-103-443-REP-06-D_.pdf | Download |
ECC-103-443-BID-03-D.pdf | Download |
Osino Gold Exploration and Mining (Pty) Ltd
Approval Obtained
Energy, Infrastructure & Construction
Namibia
Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.
© ECC ENVIRONMENTAL. ALL RIGHTS RESERVED. SITE POWERED BY THINKTEAM