The proponent Osino Gold Exploration and Mining (Pty) Ltd, proposes the construction of a 66KV overhead powerline connecting the Erongo substation with the Twin Hills Gold Project near Karibib, Erongo Region, Namibia.
Project
The proposed 66KV overhead powerline for the Twin Hills Gold Project, within the Erongo Region, Namibia
Osino 66KV overhead powerline
Project Details
Proponent's Name
Osino Gold Exploration and Mining (Pty) LtdECC's Role
ECC has been contracted by Osino Gold Exploration and Mining (Pty) Ltd as the independent Environmental Assessment Practitioner (EAP) to facilitate the entire ESIA process. Prior to the start of the proposed projects, an environmental clearance certificate is required in terms of the Environmental Management Act, 7 of 2007 and the associated EIA Regulations. A final decision relating to the above-mentioned application will be made by Ministry of Environment, Forestry and Tourism (MEFT): Department of Environmental Affairs (DEA)Sectors
Energy, Infrastructure & ConstructionCountries
NamibiaStatus
Approval ObtainedDownload Files
Register an Interest
Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.