The proposed construction and operation of an ammonia pipeline from Arandis via Farm 58 to Walvis Bay North Port, Erongo Region, Namibia

The proposed Project is the construction and operations of an ammonia pipeline is envisioned and will be constructed from Arandis via Farm 58 to the Walvis Bay port area, in the Erongo Region, Namibia.

During the Ammonia Pipeline Project, the Proponent proposes that the liquid ammonia be transported from the ammonia production plant in Arandis via the ammonia pipeline to the ammonia terminal at Walvis Bay North Port for storage and the existing jetty for future exporting purposes. The ammonia pipeline and other associated components builds on a significant emerging green ammonia industry in Namibia.

Project Details

Proponent's Name

CMB.TECH Namibia (Pty) Ltd

ECC's Role

ECC has been contracted by CMB.TECH Namibia (Pty) Ltd as the independent Environmental Assessment Practitioner (EAP) to facilitate the entire ESIA process. Prior to the start of the proposed projects, an environmental clearance certificate is required in terms of the Environmental Management Act, 7 of 2007 and the associated EIA Regulations. A final decision relating to the above-mentioned application will be made by Ministry of Environment, Forestry and Tourism (MEFT): Department of Environmental Affairs (DEA).

Sectors

Energy, Infrastructure & Construction

Countries

Namibia

Status

Submitted to Government for Record of Decision

Download Files

Report
Appendix I Climate change
1.9 MB
Report
Appendix L Addendum
1.3 MB
Report
Ammonia Pipeline ESMP
1.0 MB
Report
Ammonia Pipeline ESIA
7.8 MB
Report
Appendix K Biodiversity Study
7.8 MB
Report
Appendix J Surface and groundwater Study
0.9 MB
Report
Appendix H Traffic Study 2
1.5 MB
Report
Appendix H Traffic Study 1
1.3 MB
Report
Appendix G Heritage Study 2
5.7 MB
Report
Appendix G Heritage Study 1
2.7 MB
Report
Appendix F Noise Study 2
3.4 MB
Report
Appendix F Noise Study 1
3.4 MB
Report
Appendix E Air quality 2
2.2 MB
Report
Appendix E Air quality 1
2.2 MB
Report
Appendix D Health and safety
0.4 MB
Report
Appendix B Public Consultation Document
5.7 MB
Report
Final ammonia pipeline scoping report
1.9 MB
Report
Draft scoping report
2.0 MB
Report
Background Information Document
0.6 MB
Report
Cleanergy Presentation 8 10 July 24
10.6 MB
Report
Cleanergy Public Meeting March ECC
2.4 MB
Report
Cleanergy Solutions Presentation 12 03 24
0.8 MB

Register an Interest

Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.

Your details
First Name *
Last Name *
Company / Organisation
Nature of company or organisation
Email Address *
Telephone No. *
Address
Street Address *
Address Line 2
City *
ZIP / Postal Code *
Country *
Your interest
Declaration of Interest *
Please describe your interest in this project.
Comments *
Consent
Your information is used only for the public participation process for this project. It is not sold or shared for marketing. We keep it for the duration of the project and for five years after the record of decision, after which it is deleted. To correct or delete your details, email info@eccenvironmental.com. See our Privacy Policy for more.