Project

ESIA amendment for the Twin Hills Gold Project, Karibib District, Erongo Region

Twin Hills Gold Mine on ML 238 ESIA amendment

Environmental Compliance Consultancy (ECC) has been contracted by Osino Gold Exploration and Mining (Pty) Ltd. OGEM manages operations in Namibia as a wholly owned Shanjin International Gold Co. ECC is conducting an ESIA for the proposed mining of precious metals on Mining Licence 238 (ML 238), located near the town of Karibib, Erongo Region, Namibia.

The original assessment was submitted to the Ministry of Mines, Energy and Industry (MMEI) as the competent authority and the Ministry of Environment and Tourism (MET) in March 2022, and RoD approval was granted on the 3rd of November 2022.

Since then, the Proponent has reviewed their operational requirements and an amendment to the original ESIA is required, as updates and changes to the site layout and proposed infrastructure have been finalised. Therefore, these noted changes and potential related impacts have been re-assessed  and will be submitted to MET and the component authority (MMEI) for approval.

ECC’s Role

Environmental Compliance Consultancy (Pty) Ltd. (ECC) hereby gives notice to all members of the public that an amendment application for an environmental clearance certificate in accordance with the Environmental Management Act, No. 7 of 2007 will be made for the proposed Twin Hills Gold Project in the Erongo Region. Members of the public are invited to register as an Interested and Affected Party (IAP) and provide input into the environmental and social impact assessment.

Download Documents

FileAction
Appendix A – Construction Environmental Management Plan.pdfDownload
Osino ESIA Amendment Report Final April 2025.pdfDownload
Appendix M – Osino ML 238 ECC 2022.pdfDownload
Appendix L – EAP CVs.pdfDownload
Appendix K – Blast Management Assessment Report.pdfDownload
Appendix J – Climate Change Assessment Report.pdfDownload
Appendix I – SocioEconomic Impact Assessment.pdfDownload
Appendix H – Traffic Impact Assessment.pdfDownload
Appendix G – Archaeological Assessment Report (5 Graves Sites Report).pdfDownload
Appendix G – Archaeological Assessment Report (Possible Grave Sites Report).pdfDownload
Appendix G – Archaeological Assessment Report (Exhumation, Relocation and Reburial Report) .docx.pdfDownload
Appendix G – Archaeological Assessments Reports (NHC Consent for Osino ML 238).pdfDownload
Appendix F – Biodiversity Assessment Report.pdfDownload
Appendix E – Water Assessment Report (Feed Geichemical Testing).pdfDownload
Appendix E – Water Assessment Report (Surface Water).pdfDownload
Appendix E – Water Assessment Report (FEED Hydrology summary).pdfDownload
Appendix D – Air Quality Assessment Report.pdfDownload
Appendix C – Noise Assessment Report.pdfDownload
Appendix B – Public Consultation Records.pdfDownload
Appendix A – Operational Environmental Management Plan_final.pdfDownload

Project Details

Proponent

Osino Gold Exploration and Mining (Pty) Ltd

Status

Open for Public Participation

Sector

Mining & Minerals

Country

Namibia

Register an Interest

Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.

  • This field is for validation purposes and should be left unchanged.