Project

ESIA amendment for the Twin Hills Gold Project, Karibib District, Erongo Region

Twin Hills Gold Mine on ML 238 ESIA amendment

Environmental Compliance Consultancy (ECC) has been contracted by Osino Gold Exploration and Mining (Pty) Ltd. OGEM manages operations in Namibia as a wholly owned Shanjin International Gold Co. ECC is conducting an ESIA for the proposed mining of precious metals on Mining Licence 238 (ML 238), located near the town of Karibib, Erongo Region, Namibia.

The original assessment was submitted to the Ministry of Industries, Mines and Energy (MIME) as the competent authority and the Ministry of Environment, Forestry and Tourism (MEFT) in March 2022, and RoD approval was granted on the 3rd of November 2022.

Since then, the Proponent has reviewed their operational requirements and an amendment to the original ESIA is required, as updates and changes to the site layout and proposed infrastructure have been finalised. Therefore, these noted changes and potential related impacts have been re-assessed and will be submitted to MEFT and the component authority (MIME) for approval.

Project Details

Proponent's Name

Osino Gold Exploration and Mining (Pty) Ltd

ECC's Role

Environmental Compliance Consultancy (Pty) Ltd. (ECC) hereby gives notice to all members of the public that an amendment application for an environmental clearance certificate in accordance with the Environmental Management Act, No. 7 of 2007 will be made for the proposed Twin Hills Gold Project in the Erongo Region. Members of the public are invited to register as an Interested and Affected Party (IAP) and provide input into the environmental and social impact assessment.

Sectors

Mining & Minerals

Countries

Namibia

Status

Approval Obtained

Download Files

Report
ECC 103 442 REP 02 A ESMP final
3.7 MB
Report
ECC 103 442 REP 01 D Final for GS
18.1 MB
Report
ECC 103 586 REP 01 A Osino CEMP Final Rev2
2.1 MB
Report
Osino ML 238 ECC 2022 corrected name
4.7 MB
Report
EAP CVs
1.2 MB
Report
ECC Twin Hills Gold Project EIAReport 230815V00
2.8 MB
Report
GHG REPORT 2023 Final V1.1
8.4 MB
Report
Appendix I SocioEconomicBaselineStudy
3.3 MB
Report
4377 TIA Osino Mine Report v4 AR 2023 09 22
1.8 MB
Report
Environmental Compliance Consultancy GPR Twin Hills 5 Grave Sites Report Earthmaps KKnupp 10 08 2023
1.8 MB
Report
Environmental Compliance Consultancy GPR Twin Hills Possible Grave Sites Report Earthmaps KKnupp 11 08 2023
6.0 MB
Report
Final Heritage Report for ML 238 Exhumation Relocation and Reburial .docx
2.2 MB
Report
NHC Consent for Osino ML 238
0.2 MB
Report
Osino Gold Report Amendments 2023 Final
2.8 MB
Report
WI 24 00095 Twinhills FEED Geochemical Testing 14 06 2024 Rev0
1.0 MB
Report
Report3 r0 THGP DFS Surface Water Report 2023 06 23
5.6 MB
Report
FEED Hydrogeology Summary Report Final Rev0
2.8 MB
Report
23ECC02 Osino AQIA Rev02
3.8 MB
Report
23ECC03N Osino NIA rev1
4.2 MB
Report
Appendix B compressed
7.0 MB

Register an Interest

Please complete the below form to register as an Interested & Affected Party (I&AP) and download the relevant documents.

Your details
First Name *
Last Name *
Company / Organisation
Nature of company or organisation
Email Address *
Telephone No. *
Address
Street Address *
Address Line 2
City *
ZIP / Postal Code *
Country *
Your interest
Declaration of Interest *
Please describe your interest in this project.
Comments *
Consent
Your information is used only for the public participation process for this project. It is not sold or shared for marketing. We keep it for the duration of the project and for five years after the record of decision, after which it is deleted. To correct or delete your details, email info@eccenvironmental.com. See our Privacy Policy for more.